MWSBE/Vendor Bid Opportunities

Please review the upcoming bids noted below and submit your bid at least 2 days before the bid date to Kara Meyer at estimating@reytec.com or contact her at 713-600-3014. We encourage you to visit this page each month for new bid opportunities.

Bid Opportunities

Job Name Owner Bid Date Job Description Documentation Link
Industrial Park Roadway City of Corpus Christi

7/31/2024

3:00 PM CST

Procurement, 1201 Leopard St, Corpus Christi, TX 78401

The objective of this project is to reconstruct three (3) streets in the Industrial Park area (BAY DRIVE, DOBERMAN STREET, AND PYRENEES STREET) including improvements to the utility systems (water, wastewater, gas), improvements to overall site drainage, and to create ADA accessible routes along each reconstructed street. All proposed improvements must meet requirements stated in the City of Corpus Christi’s Infrastructure Design Manual and performance specifications which will be outlined in the RFQ.The Design/Builder shall provide a turnkey project which includes all required design, specification and installation of water lines, design, specification and installation of stormwater lines and manholes, design, specification and installation of sanitary sewer systems, design, specification and installation of ADA compliant sidewalks and curb ramps, design and installation of driveways and any other services and testing required to design and reconstruct the Industrial Park streets (BAY DRIVE, DOBERMAN STREET, AND PYRENEES STREET). Drawings & Links
HPW – 24-Inch Water Line Along Martin Luther King Jr. Blvd HPW 8/22/2024

10:30 AM CST

Bids will be opened, and the Bid Results will be posted on Civcast on Bid Date.

Microsoft Teams: 1-936-755-1521 ID: 598 888 117#

24-inch Water Line from Doolittle Boulevard to Sunbeam Street along Martin Luther King Jr. Boulevard Drawings & Links

We actively seek out opportunities to empower qualified minority and prime contractors, recognizing their vital role in driving innovation, fostering economic growth, and enriching the communities we serve. Together, we build not just infrastructure, but bridges to a more equitable future.

Todd F, Vice President of Alternative Delivery