MWSBE/Vendor Bid Opportunities
Please review the upcoming bids noted below and submit your bid at least 2 days before the bid date to our estimating team at estimating@reytec.com or contact her at 713-600-3014. We encourage you to visit this page each month for new bid opportunities.
Bid Opportunities
Job Name | Owner | Bid Date | Job Description | Documentation Link |
---|---|---|---|---|
NHCRWA Project 31F Proposed 48- inch, 24-inch, and 12-inch Water Line from Huffmeister Road to Grant Road |
NHCRWA | 6/24/2025 @ 2:00 PM CST |
Scope of Work for the NHCRWA Project 31F consists of the installation of 48-inch water line, 24-inch and 12-inch water line through a combination of open cut, tunneling construction methods, and Horizontal Directional Drill (HDD) methods, including valves, connections, and appurtenances. The project is constructed from Huffmeister Road to Grant Road through both residential and Harris County Flood Control District areas. The work also includes construction of flow control stations, meters stations, surface water fill lines and connections, in addition to chloramine conversion at Grant Road PUD Water Plant No. 2. Additionally, the project includes chemical and electrical improvements at Grant Road PUD Water Plant No. 1 and Water Plant No. 2. |
Drawings & Links |
Brazos Regional Wastewater Treatment Plant – Phase I (2.0 MGD) |
City of Sugar Land | 6/26/2025 @ 2:00 PM CST |
Construction of a 2.0 MGD Wastewater Treatment Plant (Phase I) including, but not limited to, site work (vegetation stripping, yard piping, electrical conduit and wiring, grading and drainage, tree protection, concrete access roads and fencing), new concrete structures (lift station, headworks, aeration basin, clarifiers, disinfection basin, cloth filter basin, digester complex and sludge dewatering, concrete service pads (for stair landing, equipment, electrical and chemical tanks), sodium hypochlorite and sodium bisulfite chemical feed system, treatment equipment, electrical, instrumentation and controls. |
Drawings & Links |
HPW – North Corridor Consolidation Package 3 – Flow Diversion (36-inch) from Imperial Valley WWTP to Northgate Regional LS |
City of Houston | 6/26/2025 @ 10:30 AM CST |
Work of the contract is for the North Corridor Consolidation Package 3, which includes construction of 36-inch, 42-inch and 24-inch gravity sewers by trenchless construction method, demolition and abandonment of Imperial Valley WWTP, Aldine Bender LS and Northbelt LS. |
Drawings & Links |
RFB 6628 Starlite Lane (Violet and Leopard) 23153 |
City of Corpus Christi | 7/09/2025 @ 2:00 PM CST |
Starlite Lane, from Violet Road to Leopard Street, is a roadway reconstruction project and includes various street and utility improvements. The project objective is to reconstruct the existing roadway pavement section and to reconstruct select underground utilities. This project also includes reconstruction of the existing sidewalk, curb ramps, concrete driveways, concrete curb and gutter, roadway striping, roadway pavement Refer to contract documents, plans and specifications for additional information. |
Drawings & Links |
We actively seek out opportunities to empower qualified minority and prime contractors, recognizing their vital role in driving innovation, fostering economic growth, and enriching the communities we serve. Together, we build not just infrastructure, but bridges to a more equitable future.