WWTP Replacement – Montgomery County MUD No. 119

Owner: Montgomery County Engineer of Record: Quiddity Engineering Construction Manager: Tyra Morgan-Soriggins, Quiddity Engineering Value: $19,088,000 Project Overview The Wastewater Treatment Plant (WWTP) Replacement for Montgomery County MUD No. 119 represents a major investment in modern wastewater infrastructure—designed to increase treatment capacity, improve environmental compliance, and support continued community growth. This ground-up replacement project

By |2025-11-19T14:25:14+00:00October 22nd, 2025|Waterworks|

West Harris County Regional Water Authority (WHCRWA) Central Pump Station – Katy, Texas

Owner: West Harris County Regional Water Authority Engineer of Record: AECOM Value: $92,860,000 Project Overview The West Harris County Regional Water Authority (WHCRWA) Central Pump Station represents one of the most significant components of the region’s long-term surface water supply and distribution program. Located in Katy, Texas, this major facility is designed to receive

By |2025-10-26T16:18:29+00:00October 22nd, 2025|Waterworks|

NHCRWA Project 25C – 84” Water Line Along CenterPoint Energy Northbelt Corridor

Value: $1,590,937.87 Owner: North Harris County Regional Water Authority Engineer of Record: AECOM Project Overview When the bonding company for BRH Garver needed a trusted partner to complete NHCRWA Project 25C, Reytec Construction was selected to step in and deliver the final scope with precision and accountability. The project involved the installation and testing

By |2025-10-26T16:18:29+00:00October 22nd, 2025|Waterworks|

84-Inch Water Line Along Gessner Road from SH 249 Regional Pump Station to Greens Bayou

Owner: North Harris County Regional Water Authority (NHCRWA) Engineer of Record: Arcadis Value: $8,984,817.50 Project Overview The 84-Inch Water Line Along Gessner Road serves as a critical connection in the North Harris County Regional Water Authority’s (NHCRWA) large-diameter water transmission network. Designed to link the SH 249 Regional Pump Station to the Greens Bayou corridor,

By |2025-11-07T19:04:28+00:00October 22nd, 2025|Waterworks|

Road Reconstruction — Neuens Road (Gessner to Blalock)

Owner: [To be added] Engineer of Record: [To be added] Construction Manager: [To be added] Value: $11,453,656.86 Project Overview The Neuens Road Reconstruction project transformed a two-lane asphalt facility into a higher-capacity, more resilient concrete road, spanning the stretch between Gessner Road and Blalock Road. Reytec’s work focused on replacing the deteriorated pavement and

By |2025-10-26T16:18:30+00:00October 22nd, 2025|Heavy Civil Construction|

Memorial Park Central Connector — Memorial Drive Reconstruction

Value: $3,490,829.00 General Contractor: Tellepsen Lead Design / Civil Engineer: Ardurra (with Nelson Byrd Woltz, Walter P. Moore, Freese & Nichols, etc.) Project Overview The Memorial Park Central Connector is a transformative initiative aimed at reuniting Houston’s iconic Memorial Park, which has long been divided by Memorial Drive. As part of the city’s ten-year

By |2025-10-26T16:18:30+00:00October 22nd, 2025|Heavy Civil Construction|

George R. Brown Convention Center Transformation Project: Enabling Works Infrastructure

Value: $23,282,000.00 Owner: Houston First Engineer of Record: Jacobs & Aurora Technical Services Project Overview Located in the heart of downtown Houston, this major infrastructure project supports the transformation of the George R. Brown Convention Center district and adjacent entertainment corridor. Reytec Construction was contracted to execute critical enabling works to prepare the area for

By |2025-11-07T19:06:39+00:00October 22nd, 2025|Heavy Civil Construction|

FWSD #23 Wastewater Improvements

Value: $4,376,150 Owner: City of Houston Fresh Water Supply District Project Overview The FWSD #23 Wastewater Improvements project exemplifies Reytec’s precision and expertise in complex underground construction. Designed to improve wastewater conveyance within an active treatment environment, the project was completed entirely inside the operational boundaries of the FWSD #23 Wastewater Treatment Facility—requiring exceptional technical

By |2025-11-07T19:08:53+00:00October 22nd, 2025|Waterworks|

Waugh Drive, Yoakum Boulevard, Commonwealth Street, and Montrose Boulevard at Westheimer Intersection Improvements

Owner: Montrose TIRZ 27 Engineer of Record: Gauge Engineering Value: $2,800,000 Project Overview Reytec Construction Resources, Inc. was selected by Montrose TIRZ 27 to deliver comprehensive roadway and streetscape improvements along one of Houston’s most active urban corridors — the intersections and connecting segments of Waugh Drive, Yoakum Boulevard, Commonwealth Street, and Montrose Boulevard

By |2025-10-26T16:18:30+00:00October 22nd, 2025|Heavy Civil Construction|

Bissonnet Street Reconstruction – Buffalo Speedway to Kirby Drive

Bissonnet Street Reconstruction – Buffalo Speedway to Kirby Drive Owner: Upper Kirby Redevelopment Authority (UKRA) Engineer of Record: Gunda Corporation Value: $7,700,000 Project Overview Reytec Construction Resources, Inc. was selected by the Upper Kirby Redevelopment Authority (UKRA) to complete the full reconstruction of Bissonnet Street between Kirby Drive and Buffalo Speedway, one of Houston’s

By |2025-11-26T10:29:58+00:00October 22nd, 2025|Heavy Civil Construction|