Skip to content
  • HOME
  • About
    • Accolades
    • Community Relations
    • Five Companies
    • Our Leadership Team
    • Safety
  • Construction services
    • Houston Heavy Civil
    • Emergency Utility Services
    • Waterworks
    • Corpus Christi Heavy Civil Construction
  • Bid Opportunities
  • Careers
  • Contact
  • Blog

Heavy Civil Construction

  • CALDER STREET DRAINING IMPROVEMENT PH I
    Gallery

    CALDER STREET DRAINING IMPROVEMENT PH I

    Reytec Construction Resources, Inc.-May 20th, 2019-

    Contract amount: $24 million Calder Street Drainage Improvement: This job included street and drainage improvements on Calder Street from Pheland Boulevard to the IH-10 east bound frontage road. The work included removing landscaping, planters, asphalt overlay, concrete pavement and curb, flexible base, surfacing, driveways

  • WILLIAMS ST.
    Gallery

    WILLIAMS ST.

    Reytec Construction Resources, Inc.-January 15th, 2019-

    Contract amount: $19 million Williams Drive Phase I & II from Rodd Field Road to Airline Drive: This included street and drainage improvements on Williams Drive. (The new drive became a main artery in Corpus Christi’s new medical district.) The work included installing large storm

  • UT M.D. ANDERSON HERMAN PRESSLER ROAD PROJECT
    Gallery

    UT M.D. ANDERSON HERMAN PRESSLER ROAD PROJECT

    Reytec Construction Resources, Inc.-January 15th, 2019-

    Contract amount: $4.5 million M.D. Anderson Ambulatory Clinical Care Building – Herman Pressler Road & Utility Extension: Reytec acted as prime subcontractor to Hensel Phelps, a design build general contractor. This project included concrete and asphalt paving, curbs, sidewalks, storm sewer, domestic water, sanitary sewer

  • UPTOWN DEVELOPMENT AUTHORITY – MIDDLE SECTION
    Gallery

    UPTOWN DEVELOPMENT AUTHORITY – MIDDLE SECTION

    Reytec Construction Resources, Inc.-January 15th, 2019-

    This construction included the removal of existing asphalt paving and curb for approximately 1,000 linear feet and the placement of 10-inch thick, 5-lane concrete boulevard section with 9-inch crushed subgrade.

  • Neighborhood Street Reconstruction (NSR) No. 465
    Gallery

    Neighborhood Street Reconstruction (NSR) No. 465

    Reytec Construction Resources, Inc.-January 15th, 2019-

    Contract amount: $15.3 million Neighborhood Street Reconstruction No. 465A: This job included the construction of paving, drainage, water and wastewater improvements along segments of various neighborhood streets throughout the Springwood Oaks, Timber Oaks, Wrenwood Oaks and Royal Oaks subdivisions in the Spring Branch area.

  • HOUSTON RAPID TRANSIT EAST END PAVING
    Gallery

    HOUSTON RAPID TRANSIT EAST END PAVING

    Reytec Construction Resources, Inc.-January 15th, 2019-

    Contract amount: $3.1 million East End Utility Relocation Segment 1B: This included public utility relocations over a portion of the East Corridor along Harrisburg Boulevard between Stiles Street and Altic Boulevard. East End Paving This entailed construction of initial roadway construction for the East End

  • KIRBY DRIVE STORM SEWER RELIEF PROJECT SEGMENT 3
    Gallery

    KIRBY DRIVE STORM SEWER RELIEF PROJECT SEGMENT 3

    Reytec Construction Resources, Inc.-January 15th, 2019-

    Contract amount: $14.3 million Kirby Drive Storm Sewer Relief Project Segment 3: Reytec served as the prime contractor to the City of Houston and was responsible for the traffic control, street lighting, pavement markings, pollution prevention, site work/landscaping, demolition of existing concrete/asphalt and paving (curbs,

  • THE UNIVERSITY OF TEXAS M.D. ANDERSON CANCER CENTER
    Gallery

    THE UNIVERSITY OF TEXAS M.D. ANDERSON CANCER CENTER

    Reytec Construction Resources, Inc.-January 15th, 2019-

    Contract amount: $9 million U.T. Research Park Infrastructure Improvements Phase One: Reytec served as the prime subcontractor to J.E. Dunn, a design build general contractor. We were responsible for the turnkey installation of all utilities listed below. Underground Utilities: 4,461 linear feet of 12-inch PVC

  • Chaparral Street – Williams St. to Schatzel St.
    Gallery

    Chaparral Street – Williams St. to Schatzel St.

    Reytec Construction Resources, Inc.-January 14th, 2019-

    Contract Amount: $5 million Downtown Street Improvements to Chaparral Street from William Street to Schatzel Street: This project included the redesign of the roadway and pedestrian right of way of Chaparral Street between William Street and Schatzel Street. The right of way included designed pavers,

  • CALDER STREET DRAINAGE IMPROVEMENT – Phase III
    Gallery

    CALDER STREET DRAINAGE IMPROVEMENT – Phase III

    Reytec Construction Resources, Inc.-January 14th, 2019-

    Contract amount: $9 million Calder Street Drainage Improvement - Phase III: This job included street and drainage improvements on Calder Street from Pheland Boulevard to the IH-10 east bound frontage road. Reytec removed inlets, manholes, culverts and storm pipe as well as placed new

12Next

Your trusted infrastructure partner since 1996. From Houston to Austin to Corpus Christi, we excel in construction and utility services. With a focus on safety, quality, and reliability, we keep communities moving forward, 24/7.

Learn More
latest LinkedIn Posts

contact us today
  • Corporate Location
    1901 Hollister St.
    Houston, Tx 77080

  • Phone: 713.957.4003
    Fax: 713.681.0077

©COPYRIGHT 2012 - 2025 | Reytec Construction Resources, Inc.

Page load link
Go to Top