24/7 Storm Sewer, Waterline and Water Treatment Plant Repair
Reytec Construction Resources is the trusted contractor for waterline, water treatment plant and storm sewer emergencies. Our service crews and trucks are available 24 hours a day, seven days a week. With more than 25 years in emergency utility services, we proudly serve as the emergency utility services team for the City of Houston and we often work in Brazoria County and Fort Bend County as well. Additionally, Reytec is working with the City of Houston on a program to maintain fire hydrants throughout the city. This pro-active approach to hydrant maintenance will prevent many possible leaks and reduce the City’s ongoing costs.
From large diameter storm sewers and watermain repairs to damaged fire hydrants and valves, Reytec runs multiple crews to fix emergencies fast. We can work on your schedule to make routine repairs and we’re equipped to handle true emergency needs. Our teams ― from the command center at our corporate office to the crews in the field ― have worked with all types of pipe in thousands of scenarios. In fact, we often discover that our experience prepares us to recommend the best solution for many emergencies. We also understand the need to properly assess the site for phone, power, gas and fiber optic lines as well as the impact on local traffic. Our commitment to safety is paramount.
Plus, we consistently beat projected schedules. For example, when the City of Houston called Reytec to fix a 66-inch watermain on the north 60, city officials expected the repair to take five days. However, our emergency utility services group completed the repair in just two days. We’re dedicated to fast, quality work to keep your municipality running smoothly.
From 5/8-inch to 108-inch diameter, overnight, rain or shine, you can depend on Reytec’s service team to bring quality emergency repairs to your site with the inspector’s needs met each time.
Contact Reytec’s service team at 713-957-4003 for solid experience with utility emergencies. You may also contact George Gutierrez at 281-802-6055.
Emergency Utility Services Projects
City of Houston
- FY23 Drought EPO WL Wrap Repairs: $3,568,655.46
- Houston Public Works On-Call Rehabilitation of Large Diameter Water Lines Package 2: $2,500,000
- Emergency On-Call Services for Kingwood: $1,521,986.49
- Houston Public Works Miscellaneous Small Diameter, Fire Hydrant, Valves & Water Lines Package 1: $4,383,876.66
- Houston Public Works Miscellaneous Small Diameter, Fire Hydrant, Valves & Water Lines Package 2: $4,383,876.66
- Houston Public Works Miscellaneous Small Diameter, Fire Hydrant, Valves & Water Lines Package 3: $4,383,876.66
- Emergency On-Call Services: $3,536,000
- FY2018 Drainage Rehab Work Orders #3 for Houston Public Works – $3,000,000
- Award for Work Orders & On-Call Large Diameter Water Mains and Valves Package No. 14 – $2,500,000
- Fire Hydrant Replacement Project – $3,407,318.60
- FY17 Local Drainage Project Work Order Construction {Contract 2} – $3,000,000
- Waterline Rehab and Replacement Project – $ 1,765,486.72
- Fire Hydrant Replacement Project – $1,659,625.06
- FY2018 Drainage Rehab Work Orders #4 – $3,000,000
City of Bellaire
- Water Valve Repair- Replace and Assessment: $400,000
- Fire Hydrant Assessment, Maintenance, Repair, and Replacement Services: $199,475
North Harris County Regional Water Authority:
- On Call System Repair Contract No. 3: $1,892,000
Emergency Utility Services Projects
Emergency Utility Services
City of Houston
- FY23 Drought EPO WL Wrap Repairs: $3,568,655.46
- Houston Public Works On-Call Rehabilitation of Large Diameter Water Lines Package 2: $2,500,000
- Emergency On-Call Services for Kingwood: $1,521,986.49
- Houston Public Works Miscellaneous Small Diameter, Fire Hydrant, Valves & Water Lines Package 1: $4,383,876.66
- Houston Public Works Miscellaneous Small Diameter, Fire Hydrant, Valves & Water Lines Package 2: $4,383,876.66
- Houston Public Works Miscellaneous Small Diameter, Fire Hydrant, Valves & Water Lines Package 3: $4,383,876.66
- Emergency On-Call Services: $3,536,000
- FY2018 Drainage Rehab Work Orders #3 for Houston Public Works – $3,000,000
- Award for Work Orders & On-Call Large Diameter Water Mains and Valves Package No. 14 – $2,500,000
- Fire Hydrant Replacement Project – $3,407,318.60
- FY17 Local Drainage Project Work Order Construction {Contract 2} – $3,000,000
- Waterline Rehab and Replacement Project – $ 1,765,486.72
- Fire Hydrant Replacement Project – $1,659,625.06
- FY2018 Drainage Rehab Work Orders #4 – $3,000,000
City of Bellaire
- Water Valve Repair- Replace and Assessment: $400,000
- Fire Hydrant Assessment, Maintenance, Repair, and Replacement Services: $199,475
North Harris County Regional Water Authority:
- On Call System Repair Contract No. 3: $1,892,000
As the director of emergency utility repairs, my focus is unwavering: to swiftly mobilize and coordinate teams to restore essential services, ensuring minimal disruption and maximum resilience in times of crisis.