KIRBY DRIVE STORM SEWER RELIEF PROJECT SEGMENT 3

Contract amount: $14.3 million Kirby Drive Storm Sewer Relief Project Segment 3: Reytec served as the prime contractor to the City of Houston and was responsible for the traffic control, street lighting, pavement markings, pollution prevention, site work/landscaping, demolition of existing concrete/asphalt and paving (curbs, sidewalks and storm sewer). This project consisted of: approximately 2,945

By |2025-10-26T16:19:01+00:00January 15th, 2019|Heavy Civil Construction|

THE UNIVERSITY OF TEXAS M.D. ANDERSON CANCER CENTER

Contract amount: $9 million U.T. Research Park Infrastructure Improvements Phase One: Reytec served as the prime subcontractor to J.E. Dunn, a design build general contractor. We were responsible for the turnkey installation of all utilities listed below. Underground Utilities: 4,461 linear feet of 12-inch PVC water main, open cut 952 linear feet of 8-inch PVC

By |2025-10-26T16:19:01+00:00January 15th, 2019|Heavy Civil Construction|

HEDRICK FORCE MAIN CROSSING

Contract amount: $ 2.9 million Hedrick Force Main Crossing: Our work for the City of Houston included the demolition and replacement of the existing aerial force main with underground 42-inch force main, crossing Buffalo Bayou at Wayside Drive and 69th Street. For more details on this project, please contact Reytec Projects.

By |2025-10-26T16:19:01+00:00January 14th, 2019|Waterworks|

Chaparral Street – Williams St. to Schatzel St.

Contract Amount: $5 million Downtown Street Improvements to Chaparral Street from William Street to Schatzel Street: This project included the redesign of the roadway and pedestrian right of way of Chaparral Street between William Street and Schatzel Street. The right of way included designed pavers, planters and catenary lighting to enhance the overall atmosphere of

By |2025-10-26T16:19:01+00:00January 14th, 2019|Heavy Civil Construction|

CALDER STREET DRAINAGE IMPROVEMENT – Phase III

Contract amount: $9 million Calder Street Drainage Improvement - Phase III: This job included street and drainage improvements on Calder Street from Pheland Boulevard to the IH-10 east bound frontage road. Reytec removed inlets, manholes, culverts and storm pipe as well as placed new storm sewer box, pipes, inlets and manholes. Our crew also

By |2025-10-26T16:19:01+00:00January 14th, 2019|Heavy Civil Construction|

WILLIAM P. HOBBY AIRPORT – TERMINAL IMPROVEMENT PROGRAM – PHASE 1

Contract amount: $7.7 million William P. Hobby Airport – Terminal Improvement Program: East Concourse and Ticketing Building – Phase 1 This project consisted of demolishing the existing pavement and replacing 35,000 square yards of 16-inch concrete pavement at the Apron area. It also included constructing temporary access ways, installing trench drain, foundation for the blast

By |2025-10-26T16:19:02+00:00January 14th, 2019|Heavy Civil Construction|

UT M.D. ANDERSON CANCER CENTER – Eby Bates

Contract amount: $2.2 million M.D. Anderson Cancer Center: Reytec acted as prime subcontractor to Eby Construction/Flintco. Reytec was responsible for the realignment of Bates Road in front of the Clark Cancer Clinic, which included the relocation of large diameter oak trees, dedicated monument pavers, the installation of temporary asphalt roads, sidewalks and temporary pedestrian walkways,

By |2025-10-26T16:19:02+00:00January 13th, 2019|Heavy Civil Construction|