Post Oak Boulevard from Richmond Avenue to IH 610
Contract amount: $34.2 million
Post Oak Boulevard Reconstruction – Middle Section: This construction included the removal of existing asphalt paving and curb for approximately 1,000 linear feet and the placement of 10-inch thick, 5-lane concrete boulevard section with 9-inch crushed subgrade. The work included the installation of a concrete storm sewer, ranging in size from 24-inch to 30-inch, installation of a 12-inch waterline and installation of a 12-inch sanitary sewer line. We also added 2 dedicated, Rapid Bus Transit lanes. Reytec also installed Uptown sidewalks, Uptown Corner Plazas, pedestrian lights, granite bollards, landscaping and irrigation.
Uptown Houston Construction Program
Contract amount: $9.6 million
Reytec removed the old roadway and replaced it, upgrading Guilford Court from Westheimer to Sage. This also included the removal of existing concrete sidewalk and wheelchair ramps as well as the installation of Uptown Concrete sidewalks, Uptown Corner Plazas, pedestrian lighting, granite bollard, landscaping and irrigation. Reytec also upgraded the street scape and improved the sidewalks and bus stops.
For more details on this project, please contact Reytec Projects.